<?xml version="1.0"?>
<rss version="2.0"><channel><title>Project Delivery: Turning Brief into Built Reality Latest Topics</title><link>https://www.occupierworld.com/forums/forum/67-project-delivery-turning-brief-into-built-reality/</link><description>Project Delivery: Turning Brief into Built Reality Latest Topics</description><language>en</language><item><title>Realistic cost estimates at pre-construction stage: is what we present to the board defensible?</title><link>https://www.occupierworld.com/forums/topic/78-realistic-cost-estimates-at-pre-construction-stage-is-what-we-present-to-the-board-defensible/</link><description><![CDATA[<p>Research in the International / Journal of Construction Engineering and Management identifies a consistent pattern of optimism bias in pre-construction cost estimates, particularly in occupier-led projects where the design is still evolving and market benchmarks are applied without adequate project-specific adjustment.</p><p>The result is a board approval at RIBA Stage 2 based on a number that bears limited resemblance to the out-turn cost. By the time the real figure surfaces, commitment is too deep to reverse and the conversation becomes about finding savings rather than making a genuine decision.</p><p>How do you build genuine contingency and risk allowance into a business case without the number being rejected by Finance as too conservative? What's your methodology for getting to a defensible estimate early?</p><p></p><p>Couple of links below for those who want to read more on topic. Spoiler alert, out of the six categories of factors that determine whether a conceptual cost estimate is reliable before a spade hits the ground, Bozorgmehr Nia, Taheri and Jamalpour 2023 study's most striking finding: <strong>time allocated to the estimate</strong> is rated by practitioners as the single most influential factor of all twenty categories assessed.</p><p><a rel="external nofollow" href="https://www.academia.edu/105754460/Achieving_Realistic_Cost_Estimates_in_Building_Construction_Projects_A_Reliability_Assessment_of_Pre_Construction_Stage_Cost_Estimates">(50) Achieving Realistic Cost Estimates in Building Construction Projects: A Reliability Assessment of Pre-Construction Stage Cost Estimates</a></p><p><a rel="external nofollow" href="https://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0000260">Impact of Optimism Bias Regarding Organizational Dynamics on Project Planning and Control | Journal of Construction Engineering and Management | Vol 137, No 2</a></p><p></p>]]></description><guid isPermaLink="false">78</guid><pubDate>Wed, 10 Jun 2026 13:09:42 +0000</pubDate></item><item><title>The client-side Lean Construction (LC) challenge nobody talks about</title><link>https://www.occupierworld.com/forums/topic/71-the-client-side-lean-construction-lc-challenge-nobody-talks-about/</link><description><![CDATA[<p>We are currently in the pre-construction phase of a significant relocation and fit-out (multi-floor, complex brief, tight programme) with a business that has strong opinions about the end product and limited appetite for delays and overruns.</p><p>The Lean Construction (LC) approach has been described as a practical collection of theories, principles, strategies, techniques, and ways of thinking that together enhance project teams and individuals to improve work processes and produce better value (Mossman 2018).</p><p>I have been doing a deep dive into lean construction methodology to assess how applicable it is to a large office fit-out context where we are the client, not the contractor and where our ability to influence how the delivery team operates is real but not unlimited.</p><p>The core lean construction methodology promises a fundamentally different delivery experience and is built collaborative planning exercises, detailed project definition with robust, integrated planning, procurement and project delivery.</p><p>I am acutely aware that reading about lean construction and doing it on a client fit-out with a demanding internal client are very different propositions.</p><p><strong>Question for the community:</strong> Has anyone successfully introduced LC discipline on a fit-out project where the main contractor was not already a lean practitioner? </p><p>How did you position it; as a client requirement, a collaborative suggestion or something else entirely?</p><p>Genuinely hear from peers who have been here before.</p><p></p><p>For those interested to read more I have copied a few links below -</p><p><a rel="external nofollow" href="https://www.leanuk.org/what-is-lean/">What is Lean in Business? | Lean Enterprise Academy</a></p><p><a rel="external nofollow" href="https://theleanbuilder.com/blog/">Lean Construction Blog by the Experts at </a><a rel="external nofollow" href="https://TheLeanBuilder.com">TheLeanBuilder.com</a></p><p><a rel="external nofollow" href="https://leanconstructionblog.com/">Lean Construction Blog</a></p><p><a rel="external nofollow" href="https://4bt.us/simple-guide-to-lean-construction/">https://4bt.us/simple-guide-to-lean-construction/</a></p><p></p>]]></description><guid isPermaLink="false">71</guid><pubDate>Fri, 15 May 2026 15:36:13 +0000</pubDate></item></channel></rss>
